Supercharge.info map – Detailed site location information for existing and upcoming Superchargers for which there is firm evidence (planning or construction). Click on markers for detailed site information; for recent updates refer to the Changes tab.
Get notifications on supercharger.info’s UK changes via https://twitter.com/supercharge_uk (turn on feed alerts) – thanks to @scottrobertson
TOUK Google map – Existing and upcoming Superchargers accurate to postcode level plus additional layers for more speculative site locations.
Marker links in the tables below also reference Tesla’s map. Note that this is not the same as the in-car navigation database and has some errors and omissions. The crowdsourced Supercharge.info map is generally more accurate.
PlugShare’s supercharger list – Tesla and PlugShare have a unique partnership and all Supercharger locations are locked against edits. Locations in construction are usually ‘hidden’ until Tesla asks for them to be public. It is not unusual for locations to appear ‘live’ on PlugShare a few days before Tesla’s own site has been updated.
Planning authorities for Motorway Service Areas (MSAs) – a list of local authorities responsible for authorising planning applications relevant to each service area. These can be used as a way to researching the history or new plans at a service area.
Sites opened in 2022
(A 2021 summary is available in this post: UK and Ireland Supercharger Site News – 2021 Archive).
Date opened | Supercharger (Tesla marker) | Supercharge.info map reference |
Target opening | Location (target marker location comments) & notes | Ref. |
---|---|---|---|---|---|
19/01/22 | Dartford Service Centre | Dartford (SC), UK | Not previously listed | In paint shop area of Dartford Service Centre. [12 x V3 250 kW] |
#3,979 (19/01/22) |
25/01/22 | Grays | Grays, UK | Not previously listed | Lakeside Shopping Centre, West Thurrock (no known previous marker). [16 x V3 250 kW] |
#4,024 (25/01/22) |
11/02/22 | Romford | Romford, UK | Q1 2022 (on schedule) |
On ground floor of Liberty Shopping Centre. Tesla map marker added February 2022 (after construction had begun), close to known location. [12 x V3 250 kW] |
#4,159 (13/02/22) |
09/03/22 | Harrogate | Harrogate, UK | Not previously listed | Crimple Hall garden centre (no known previous marker). [6 x V3 250 kW] |
#4,295 (10/03/22) |
23/03/22 | Manchester Trafford Centre | Trafford, UK | Q1 2022 (on schedule*) |
Regent 14 car park, Trafford Centre, Manchester *Tesla map marker was on M60 close to known location. Target date moved from Q3 to Q4 in August 2021 and to Q1 2022 in February 2022. [18 x V3 250 kW] |
#4,338 (24/03/22) |
01/04/22 | Nottingham City Centre | Nottingham – Victoria Centre, UK | Q1 2022 (almost on schedule) |
Victoria Centre (Green Zone, Basement Car Park), Glasshouse St, Nottingham. Tesla map marker added February 2022, close to known location. [12 x V3 250 kW] |
#4,411 (03/04/22) |
04/04/22 | Ferrybridge | Ferrybridge, UK | Q1 2022 (almost on schedule*) |
Moto Ferrybridge Services. Marker was in the middle of a nearby motorway junction. *Target date changes: Q2 to Q3 2021 (April 2021); 2022 (August 2021); Q1 2022 (February 2022). [12 x V3 250 kW] |
#4,421 (04/04/22) |
07/04/22 | Winchester | Winchester (SC), UK | Q1 2022 (almost on schedule*) |
Winchester Service Centre. *Target date changes: Q1 2022 (April 2021); Q2 2022 (August 2021); Q1 2022 (February 2022). [12 x V3 250 kW] |
#4,429 (07/04/22) #4,434 (08/04/22) |
21/04/22 | Norwich – East | Norwich East, UK | Not previously listed | Gridserve Electric Forecourt, Broadland Gate Business Park, Norwich. [8 x V3 250 kW] (plus additional third party rapid chargers) |
#4,529 (19/04/22) #4,549 (21/04/22) |
10/06/22 | Tongham | Tongham, UK | Q2 2022 (on schedule*) |
Hog’s Back Hotel & Spa, on A31 between Farnham and Guildford. Tesla map marker added February 2022, close to known location. *Target date moved from Q1 2022 to Q2 2022 in April 2022. [8 x V3 250 kW] |
#4,692 (10/06/22) |
Sites expanded/upgraded in 2022
Date opened | Supercharger | Previous Spec | New Spec | Ref. |
---|---|---|---|---|
22/04/22 | Edinburgh – Newbridge | 8 x V3 250 kW | 16 x V3 250 kW (12 x V3 250 kW available as of 22/04/22 with 4 awaiting final commissioning) |
#4,578 (27/04/22) |
Upcoming Sites from Tesla.com/permits/construction/awaiting commission (please don’t add unconfirmed rumours)
The tables below show proposed sites listed on Tesla’s website (Tesla Superchargers in the United Kingdom), grouped by Tesla’s Target Opening date. Historically these have been approximate in terms of both location and timing; some markers may end up being removed. In January 2021, Tesla indicated the target site information will be updated quarterly; in 2022 extensive updates were been made in February 2022 and April 2022 (follow links for summaries of the changes).
Additional sites not on Tesla’s list are also included: if construction has started they are listed in the first table below, other sites (typically where planning requests have been submitted) are listed separately at the end.
Tesla have a separate list of proposed Service Centres on their website (Tesla Service Centers [sic] in United Kingdom), many of which end up with Superchargers. These are included as additional sites if they are not captured by Tesla’s proposed Supercharger list but there is evidence (planning or construction) of Superchargers being installed.
Links in the Local Name column open the supercharge.info map centred on the site location marker. Click the marker for more information.
Under Construction
Marker | Local Name | Target Opening | Plans/Permit | Notes | Ref. |
---|---|---|---|---|---|
Birch Westbound | Moto Birch Westbound | Q3 2022 | Rochdale Council [Grant subject to conditions 02/09/20] |
10x V3 and 6 Ecotricity on plans. Groundworks underway: initial groundworks commenced at the start of October (Tesla equipment not yet spotted). In Jan 2021 Tesla had two Birch markers with identical locations midway between the separate eastbound/westbound service areas; one marker was removed in April 2021 & reinstated in April 2022 (see Birch Eastbound, below). Target date changes: Q2 to Q3 2021 (April 2021); Q3 to Q4 2021 (August 2021); remaining marker removed 03-Feb-22 then reinstated April 2022, target opening Q3 2022. |
#1,582 (29/07/21) #3,668 (08/10/21) |
Edinburgh – Newbridge | Newbridge (SC) – Edinburgh | TBC | Expansion | Part commissioned: 8 x V3 250 kW being added opposite existing 8 x V3 250 kW stalls. 4 of 8 additional stalls live as of 22/04/22. | #3,953 (15/01/22) |
Fleet Southbound | Welcome Break Fleet Southbound | TBC (2022?) | Constructed in September 2017 | Awaiting final commissioning (Sept 2017) x12 V2 [Not on Tesla map – removed February 2022]. Rumoured to be held up by power supply issues; mothballed after construction. Reportedly hoping to open “fairly soon” as of May 2022. Former marker target date moved from 2022 to Q4 2021 in August 2021; marker removed on 03-Feb-22. |
#2,751 (16/02/21) #4,640 (11/05/22) |
Heston | Moto Heston Westbound Services | TBC | Hounslow Council [Approved 08-Jan-21] |
x10 supercharger bays shown on plans. Planning ref 01256/A/P68 resubmitted 03-Nov-20. Groundworks underway as of 24/11/21: initial groundworks (Tesla equipment not yet spotted). [Not on Tesla map – nearest marker is Heathrow] |
#3,811 (24/11/21) |
Newark | Maltings Retail Park | Q3 2022 | Under construction: 10 x V3 based on number of stall foundations delivered to the site at Maltings Retail Park, N Gate, Newark. Tesla map marker added April 2022, close to site location. |
#4,617 (02/05/22) |
|
North Greenwich | Intercontinental Hotel | TBC | Relocation | Awaiting final commissioning 12x V2 in outside hotel car park, thought to be replacing the original indoor 12 x V2 stalls. Groundworks look complete as of 06-Apr. Original site has been temporarily closed since March 2020. | #4,494 (12/04/22) |
Oxford Redbridge | Redbridge Park and Ride | Q2 2022 | Oxford Council 20/03145/FUL [Approved 24/02/21] |
Under construction: 12x V3 plus with Fastned rapids [set to be largest EV site in UK]. Cable laying for power supply, August 2021; groundworks for Fastned bays, January 2022; foundations for Supercharger tombstones, April 2022; 12 tombstones in place as of 01-Jun-22. Target date changes: Q4 2021 to 2022 (August 2021); 2022 to Q2 2022 (February 2022). |
#2,647 (05/01/21) #4,006 (23/01/22) #4,677 (01/06/22) |
Reading | Moto Reading Westbound Services | Q3 2022 | West Berks Council [Approved 02/09/2020] |
x12 Superchargers shown on plans. Groundworks underway as of 02/12/21 (Tesla equipment not yet spotted). Tesla map marker 4 miles away, on A33 north of M4 Jct 11, assumed to refer to this location. Target date changes: Q2 to Q4 2021 (August 2021); Q2 2022 (February 2022); Q3 2022 (April 2022). |
#1,932 (07/09/20) #3,833 (02/12/21) |
Ruxley | Ruxley Manor Garden Centre | TBC | Under construction: 20x V3 in car park of Ruxley Manor Garden Centre, Sidcup/Orpington. Groundworks underway and five charger cabinets on site as of 22/04/22. [Not on Tesla map – nearest marker is Bexleyheath] |
#4,557 (22/04/22) |
|
Thetford | Elveden | TBC | Expansion | Under construction: additional 8 x V3 250 kW being installed opposite existing 8 x V2 150 kW stalls. Site was temporarily unavailable while power supply was upgraded; now live again. Groundworks ongoing with bases for 8 new stalls on site as of 15/04/22. | #4,397 (29/03/22) #4,455 (10/04/22) #4,509 (15/04/22) |
Thurrock | Moto Thurrock Services | TBC | Thurrock Council [Granted 28/08/20] |
16x V3 and 10 Ecotricity shown on plans. Groundworks underway as of 07/10/21; groundworks and third party chargers being installed but Tesla equipment not yet spotted. Former (removed Aug 21) Tesla Map marker had target date of Q2 2021 in Jan 2021, moved out to Q4 2021 in Apr 2021. | #1,581 (29/07/21) #3,667 (07/10/21) #4,442 (08/04/22) |
Wetherby | Moto Wetherby Services | TBC | Harrogate Council [Application Permitted 24/11/21] |
x12 Superchargers inferred from plans (same layout as other joint Gridserve/Tesla developments). Groundworks underway as of 02/12/21 (power supply installation – Tesla equipment not yet spotted). [Not on Tesla map] |
#3,854 (05/12/21) |
Q2 2022
Marker | Local Name | Target Opening | Plans/Permit | Notes | Ref. |
---|---|---|---|---|---|
Bexleyheath | Q2 2022 | Tesla map marker added February 2022, close to the Broadway Shopping Centre. See also Ruxley, above. | |||
Croydon | Croydon | Q2 2022 | Croydon Council 21/04679/FUL [Approved 09/12/21] |
Plans for x8 V3 superchargers being submitted, Nov 2021. Tesla marker added to map in April 2021, has notional location in centre of Croydon. Target date moved from Q1 2022 to Q2 2022 in February 2022. | #3,802 (23/11/21) |
Newport | Q2 2022 | Tesla map marker added April 2022 in the vicinity of M4 Jct 24. | |||
Norwich | Norwich Service Centre | Q2 2022 | Norwich Council Ref 21/01218/A [Approved 15/10/21] |
Tesla Map marker is close to new Norwich Service Centre site. Refit for Service Centre includes a wayfinding arrow for “Vehicle Charging” (20-Jan). Planning drawings include the sign and a “SUC Lounge” label at one building entrance but no proposed supercharger stall layout details. Tesla map marker added February 2022. See also Norwich East, above. |
#3,676 (12/10/21) #3,998 (20/10/22) |
Reading – Service Centre | Reading Service Centre | Q2 2022 | Reading Borough Council [“Give consent” – 19/01/21] |
Preferred SUC and substation location indicated on Service Centre signage planning application document (Site Signage – P3). As of Sep 2021 some work on power supply underway; standalone building at north end of site will reportedly become a Supercharger lounge. Tesla map marker added April 2022 with Q2 2022 target date. |
#2,666 (07/01/21) #3,688 (18/10/21) |
Q3 2022
Marker | Local Name | Target Opening | Plans/Permit | Notes | Ref. |
---|---|---|---|---|---|
Belfast | Q3 2022 | Local reports that Tesla showroom would like chargers but held up by lease/power supply issues. Marker is in a public carpark close to the M3/A12 junction. Target date changes: Q3 to Q4 2021 (September 2021); Q2 2022 (February 2022); Q3 2022 (April 2022). |
#3,992 20/01/22 | ||
Birch Eastbound | Q3 2022 | Tesla map marker reinstated in April 2022. See also Birch Westbound, above. | |||
Bournemouth | Q3 2022 | Marker location, south of Ferndown on roundabout at junction of A348 Ringwood Rd and A341 Magna Rd, duplicated pre-existing Ferndown marker but with later target opening date. Ferndown marker moved to a new position nearby in April 2022 (see below). | |||
Bromley | Q3 2022 | Tesla map marker added April 2022, adjacent to The Glades shopping centre. | |||
Carmarthen | Q3 2022 | Tesla map marker added April 2022, at the St Catherine’s Walk Shopping Centre. | |||
Coventry – Judds Lane | Q3 2022 | Tesla map marker added April 2022. Name and location indicate a site at the Coventry Building Society Arena. | |||
Dorking | Denbies Wine Estate | Q3 2022 | Mole Valley District Council (see ref post) | Denbies Wine Estate, Dorking. 8x V3 (plus 3 AC chargers). Tesla Map marker added April 2022. |
#4,603 (29/04/22) |
Exeter | Moto Exeter Services | Q3 2022 | Power supply upgrade: Exeter City Council 21/1418/FUL [Application permitted 15/12/21] |
Marker is on the Moto service area. Zap-Map press release all but confirms this will be joint venture with Ecotricity [suspect 12 x V3]; Gridserve subsequently purchased Electric Highway from Ecotricity and completed a rapid charger hub upgrade in March 2022. Supercharger construction thought to be awaiting completion of power supply upgrade work which is ongoing as of April 2022. Target date changes: Q4 2021 to Q2 2022 (August 2021); Q3 2022 (May/June 2022). |
#3,848 (04/12/21) #4,569 (25/04/22) |
Ferndown | Ferndown Service Centre | Q3 2022 | Dorset Council [Out to consultation (for signage) 20/01/22] |
Thought to refer to new Service Centre planned at former Porsche dealership location (282 New Road, BH22 8ER). 8x V3 chargers shown on one of the site plans. Marker originally in location now occupied by Bournemouth marker (see above) then moved to a position just off A31 north of Ferndown in April 2022. Target date changes: Q3 2021 to Q4 2021 (April 2021); Q2 2022 (February 2022); Q3 2022 (April 2022). |
#2,660 (06/01/21) #3,900 (21/12/21) #4,069 (31/01/22) |
Glasgow – Service Centre | Glasgow Service Centre | Q3 2022 | Glasgow Council [“Grant Subject to Condition(s)” – 29/09/20] |
x8 Superchargers [Not on Tesla map]. Service Centre is now open with Superchargers expected to follow (but may be some time later/in 2022 according to a comment on the Superchargers app). Tesla map marker added in April 2022. | #1653 & #2565 (11/12/20) |
Guildford | Guildford Service Centre or Guildford Spectrum leisure complex |
Q3 2022 | Guildford Borough Council ref 22/P/00643 [for Guildford Spectrum – submitted 07/04/22] | Tesla map marker in an apparently notional town centre location. x8 Superchargers planned for Guildford Service Centre according to a local source. Timing depends on power arrangements. Additionally Guildford Spectrum leisure complex has a planning application for x12 V3 Superchargers. Tesla map marker added February 2022. Target date moved from Q2 2022 to Q3 2022 in April 2022. |
#3187 (26/05/21) #4,645 (16/05/22) |
Heathrow | Q3 2022 | Marker is at end of M4 Heathrow Airport spur. See also Heston, above. Target date changes: Q3 to Q4 2021 (April 2021), Q1 2022 (August 2021), Q2 2022 (February 2022), Q3 2022 (April 2022). | |||
London – Wimbledon | Q3 2022 | Tesla map marker added April 2022, at the location of the Centre Court Shopping Centre. | |||
Newquay | Q3 2022 | Marker was originally at Trenance Holiday Park in Newquay, subsequently moved ~6 miles east in April 2022. Rumoured to refer to Atlantic Reach Resort. Target date changes: Q3 2021 to 2022 (August 2021); Q2 2022 (February 2022); Q3 2022 (April 2022). |
#4,631 (06/05/22) |
||
Northampton | Northampton Service Centre | Q3 2022 | West Northamptonshire Council ref WNN/2021/0798, WNN/2021/0799 & WNN/2022/0139 | x8 V3 Superchargers planned for the Northampton Service Centre & shown on WNN/2022/0139 planning drawings. Tesla map marker added April 2022, close to Service Centre location. |
#4,453 (10/04/22) #4,648 (18/05/22) |
Plymouth | Q3 2022 | Marker location looks notional: in the middle of the city area on the Manadon Roundabout. See also Gridserve Plymouth Centre in table below which is thought to be a separate site. Target date changes: Q3 to Q4 2021 (September 2021); Q2 2022 (February 2022); Q3 2022 (April 2022). | |||
Sheffield | Q3 2022 | Tesla map marker added April 2022 located at Meadowhall shopping centre. | |||
Stratford | Q3 2022 | Marker location looks notional: in the middle of the Stratford area in east London, just north of Stratford International rail station. Target date changes: Q3 2021 to Q1 2022 (August 2021); Q2 2022 (February 2022); Q3 2022 (April 2022). | |||
Swansea (q222) | Q3 2022 | Tesla map marker added April 2022, close to pre-existing Swansea (q122) marker (see below) | |||
Swindon | Q3 2022 | Tesla map marker in town centre added February 2022. Moved in April 2022 to a location adjacent to Swindon Designer Outlet. | |||
Taunton | Q3 2022 | Marker is east of the town, about 2 miles east of M5 Jct 25. Target date moved from Q4 2021 to 2022 in August 2021 | |||
Watford | Q3 2022 | Tesla map marker added April 2022 in an apparently notional location in Watford town centre. |
Q4 2022
Marker | Local Name | Target Opening | Plans/Permit | Notes | Ref. |
---|---|---|---|---|---|
Brighton Station | Q4 2022 | Tesla map marker added April 2022 in an apparently notional location just north of the railway station. See also Brighton, below, which is located nearby. | |||
Brora | Q4 2022 | Tesla map marker added April 2022, at Brora Golf Club just off the A9 in northern Scotland (but may be a notional location). | |||
East Leeds | Q4 2022 | Possible candidates: Extra Skelton Lake Services, a new Doncaster Service Centre or Thorpe Park development. Thorpe Park includes a new East Leeds train station and is adjacent to the planned East Leeds Orbital road, matching the Tesla marker name and is <1 mi from marker. 190 EV car parking spaces coming to multi story – no network names mentioned. Target date changes: Q2 to Q3 2021 (April 2021); 2022 (August 2021); Q3 2022 (February 2022); Q4 (May/June 2022). |
#2,875 (29/03/21) |
||
Merry Hill | Q4 2022 | Tesla map marker added April 2022. Marker is an apparently notional location near Dudley town centre; Merry Hill retail park is ~3 miles south of Dudley. |
Date to be confirmed (TBC)
Marker | Local Name | Target Opening | Plans/Permit | Notes | Ref. |
---|---|---|---|---|---|
Brighton | TBC | A Brighton marker has existed for many years (in 2017-18 the target date was “by end 2018”). Many have dreamed only to see their hopes dashed: be wary of being seduced by unconfirmed rumours in this much longed-for location. See also Brighton Station, above. Target date changed from 2022 to TBC in May/June 2022. | |||
Faversham | TBC | Tesla map marker added February 2022. Located at Macknades Farm Shop, a location proposed by @PB1975 . Target date changed from Q2 2022 to TBC in April 2022. | #4,099 (03/02/2022) |
||
Leavesden | Mercure Hunton Park Hotel | TBC | Three Rivers District Council 19/0540/RSP & 21/1016/RSP (Retrospective planning twice refused) |
Marker is in the middle of Leavesden, some distance from the built-but-refused-planning Supercharger at Hunton Park (a second retrospective planning application for the site was refused in August 2021). Target date changes: Q2 2021 to 2023 (April 2021); 2022 (August 2021); TBC (April 2022). |
#1,560 (26/07/20) #3,500 (14/08/21) |
Liverpool East | TBC | Tesla map marker added February 2022, close but separate to pre-existing Liverpool marker (removed in April 2022). Target date changed from Q2 2021 to TBC in April 2022. | |||
Swansea (q122) | TBC | May be linked to development at Moto Swansea West (M4 J47) services. A Gridserve Electric Highway upgrade adding 6 x 350 kW chargers was completed on 05/02/22. Tesla map marker added February 2022 in an apparently notional location in Swansea city centre. Target date changes: Q2 to Q3 2022 (April 2022); TBC (April 2022). Note a second Swansea marker (target date Q3 2022) was added in April 2022 (see Swansea q222, above). |
#4,135 (08/02/22) |
Unknown
Location | Local Name | Target Opening | Plans/Permit | Notes | Ref. |
---|---|---|---|---|---|
Blandford Hill | Blandford Hill Eco Hub | TBC | Dorset Council Ref P/FUL/2021/02622 [“Granted”- 26/01/22] |
Tesla chargers mentioned on Naturalis Eco Hub development website although not explicitly indicated on planning drawings [Not on Tesla map] | #3,558 (02/09/21) #4,126 (06/02/22) |
Bromborough | Gridserve Bromborough | TBC | Wirral Council Ref APP/21/01568 [“Approve” – 09/02/22] |
x8 “Branded chargers”, likely Superchargers [Not on Tesla map] Gridserve plans also shown on their Bromborough web page. |
#3,486 (12/08/21) |
Gateshead | Gridserve Gateshead | TBC | Gateshead Council [“Granted”- 30/04/21] |
x4 “Branded chargers”, likely Superchargers [Not on Tesla map] | #2609 (23/12/20) |
Gatwick Airport | Gridserve Gatwick | Autumn 2022 | Crawley Council [“No Objection” – 12/05/21”] |
Under construction according to Gridserve press release, Dec 2021, although no photos/reports on TMC. x8 “Branded chargers”, likely Superchargers [Not on Tesla map] | #2,719 (03/02/21) #3,877 (09/12/21) |
Nevendon | Gridserve Nevendon | TBC | Basildon Council Ref 21/01515/FULL [“Awaiting Decision”] |
x4 “Branded chargers” (Tesla Supercharger stalls are shown in the proposed visuals submitted with the planning application in October 2021). Gridserve provide more information on their Nevendon web page (Aug 2021). [Not on Tesla map]. | #3,508 (16/08/21) |
Plymouth Centre | Gridserve Plymouth | TBC | Plymouth Council Ref 21/01696/FUL [“Grant Conditionally” 03/12/21] |
x4 “Branded chargers”, likely Superchargers [Not on Tesla Map]. Assumed to be additional to Tesla’s marker (see Plymouth, above). |
#3298 (14/06/21) |
Stevenage | Gridserve Stevenage | TBC | Stevenage Council Ref 21/00536/FPM [“Awaiting Decision”] |
x8 “Branded chargers”, likely Superchargers [Not on Tesla map] | #3124 (14/05/21) |
Uckfield | Gridserve Uckfield | TBC | Wealdon Council [“Approval” – 16/03/21] |
x8 “Branded chargers”, likely Superchargers [Not on Tesla map] | #2,533 (07/12/20) #2,797 (04/03/21) |
Yeovil | Gridserve Yeovil | TBC | TBC | Gridserve indicate their intention to submit a planning application on their Yeovil web page (Oct 2021) including space for x4 “branded chargers”, likely Superchargers [Not on Tesla map]. | #3,696 (21/10/21) |
Pease Pottage | Moto Pease Pottage Services | TBC | Mid Sussex Council [Approved 27/08/20] |
x12 Superchargers [Not on Tesla map – nearest marker is Brighton] | #2842 (22/03/21) |
Stafford | Moto Stafford Northbound Services | TBC | Stafford Council 20/32527/FUL [Granted 29/10/20] |
x12 Superchargers [Not on Tesla map] | #2,739 (12/02/21) |
Rownhams | Roadchef Rownhams Northbound Services | TBC | Test Valley Council [Granted 16/04/21] Update with canopy: 22/00430/FULLS [Granted 24/03/22] |
12x V3 and 12 Gridserve. Additional planning for canopy approved March 2022. Target date changes: Q2 to Q3 (April 2021); Q3 to Q4 (August 2021). Pin removed from UK list 03-Feb-22. |
#2,607 (23/12/20) #4,348 (25/03/22) |
Bridgwater | Bridgwater Gateway Business Park | TBC | Developer plans (“detailed planning permission in place”) | Business park developer brochure includes a map showing space for Tesla Charging with 8 charging bays. Possibly connected with a former 2021 Tesla marker in Bridgwater town centre (target Q2 2021 in January 2021; 2023 in April 2021; removed August 2021). Note alternative rumours link the former marker to the Gravity business park development; an M5 Moto service area is also nearby. |
#3436 (16/07/21) #2696 (21/01/21) #3,436 (16/0721) |
Kettering – Barton Hall Hotel | Barton Hall Hotel | TBC | Kettering Council [Approved 13/12/2019] |
x8 Superchargers. Barton Hall Hotel, Barton Road, Kettering, NN15 6SG. [Not on Tesla map – nearest marker was Kettering which was removed in April 2022] | #2,242 (19/10/20) |
Woodall – Northbound | Welcome Break Woodall Services | TBC (2022?) | Rotherham Council [Granted 31/07/2018; Expired 01/08/2021] |
x32 Superchargers. [Not on Tesla map – removed November 2019] Planning assumed to have expired end July 2021 (3 Years). Awaiting power supply upgrade, reportedly due to be completed in June 2022. | #3570 (08/09/21) |
Ireland
Map references
Supercharge.info map – Detailed site location information for existing and upcoming Superchargers for which there is firm evidence (planning or construction). Click on markers for detailed site information; for recent updates refer to the Changes tab.
Marker links in the tables below also reference Tesla’s map.
Sites opened in 2022
(A 2021 summary is available in this post: UK and Ireland Supercharger Site News – 2021 Archive).
Date opened | Supercharger (Tesla marker) |
Supercharge.info map reference |
Target opening | Location (target marker location comments) & notes | Ref. |
---|---|---|---|---|---|
31/03/22 | Enfield | Enfield, Ireland | Q1 2022 (on schedule*) |
Johnstown House Hotel [8 x V3 250 kW]. *Target date moved from Q3 to Q4 2021 in August 2021 and to Q1 2022 in February 2022. |
#33 |
Upcoming sites from Tesla.com/permits/construction/awaiting commission
The table below shows proposed sites listed on Tesla’s website (Tesla Superchargers in Ireland).